TIC
Calpine (Mankato Energy Center) : January 2006 to June 2006
Project consisted of installation of fuel delivery system tubing and
instrumentation for combustion turbine on a Nooter Erickson HRSG
(Heat Recovery Steam Generator) for a 150MW combined-cycle
power generation facility.
Other work included installation of CS piping ranging from 8" diameter to 24" diameter on lube oil system connecting the
turbines. Manufacturer Mitsubishi required 100% of welds to be
x-rayed in order to meet stringent quality control requirements. |