Power Generation

back back to projects page

The Industrial Company

 

image 1image 2image 3
image 4

click image to view

TIC

Calpine (Mankato Energy Center) : January 2006 to June 2006

Project consisted of installation of fuel delivery system tubing and instrumentation for combustion turbine on a Nooter Erickson HRSG (Heat Recovery Steam Generator) for a 150MW combined-cycle power generation facility.

Other work included installation of CS piping ranging from 8" diameter to 24" diameter on lube oil system connecting the turbines. Manufacturer Mitsubishi required 100% of welds to be x-rayed in order to meet stringent quality control requirements.