Marathon Petroleum Company LLC
Projects consist of various capital piping, millwright, and
boilermaker projects.
S.P.P. Platform installation project
Installed multiple platforms throughout entire plant, material was
made of hot dipped galvanized steel. Prefabricated material
was built per marathon structure steel spec. However, each
platform was retro fitted and modified in place, or in correction
to engineered drawings per Marathon structure steel spec.
Duration of work was approximately 3 months.
S.P.P. Swing gate installation project
New policy required new design of all safety gates in the
operating units. 1st phase of work consisted of 240 gates to be
installed throughout entire plant. Majority of gates installed
needed mounting hardware modification in which galvanized
steel jigs were fabricated to allow proper working service of gates.
Job was scheduled for 2 months worth and was done early in
which phase 2 was initiated in advance until the end of the
fiscal year.
Asphalt air manifold project
Fabricated and installed Carbon air line @ approximately 650 feet
of pipe. Branched pipe at 7 locations to custom made air movers
designed to push H2S out of operators working area while loading
rail cars.
Nitrogen and relief piping
Fabricated and installed new nitrogen piping to existing vessel.
Fabricated and installed relief piping to new relief valve on
existing vessel.
#3 SRU Shutdown
Associated vessel piping
needed to be fabricated and
installed during shutdown for
re-rate of piping and relief
valves.
Category 3 Inspection
Recommendations.
Multiple recommendations
including threaded piping to
welded piping, piping support
deficiencies were observed
throughout the plant and
repaired by our group.
|